Working Drawing in Architecture: The Full Drawing Set

Working Drawing in Architecture: What's Included in a Full Drawing Set

Facebook
LinkedIn
WhatsApp
Working drawings are the full set of dimensioned, annotated drawings that a building is actually built from: site plan, floor plans, elevations, sections, details and schedules, each on a numbered sheet. Below, we walk through a real sample set, sheet by sheet, in the order it is issued.

If you are a student or junior architect preparing your first drawing set, every sheet below is one you will draw, and the checklists tell you what an engineer or contractor expects to find on it.

TL;DR

  • A working drawing set is the dimensioned, buildable version of the design, not the presentation drawings used to win the client.
  • Sets are issued in a fixed order: cover and sheet list, site plan, floor plans, elevations, sections, details, then schedules.
  • India's IS 962:1989 sets the basics: dimensions in millimetres, A-series sheets, a title block at bottom right, and thick lines at least twice as thick as thin ones.
  • Sheet numbers like A-101 read as discipline, sheet type and sequence, so anyone can find the plans or the details at a glance.
  • The construction set combines architectural, structural and MEP drawings, each with its own letter prefix.
  • Revit builds the whole set from one model, so a change to a wall updates every plan, section and schedule it appears in.

What Is a Working Drawing?

A working drawing is a drawing with enough information to build from: exact dimensions, levels, materials, construction notes and references to other sheets. Together, working drawings form the drawing set that goes to the contractor, the structural and MEP engineers and, often, the approving authority.

They are different from the drawings that come before them. Concept drawings are sketches that explore ideas. Presentation drawings are rendered plans, elevations and 3D views made to explain the design to a client or jury, and they leave out dimensions and construction detail. Working drawings are plain, precise and coordinated, and they are the ones that carry legal and contractual weight on site.

Types of Architectural Drawings in a Set

01Cover & sheet list02Site plan03Floor plans04Elevations05Sections06Details07Schedules
SheetDrawing typeTypical scaleWhat it shows
G-001Cover sheet and sheet listNTSProject name, list of every sheet, general notes, abbreviations, legend
A-100Site plan1:500 or 1:1000Plot boundary, setbacks, building footprint, access, north point
A-101Floor plans1:50 or 1:100Walls, rooms, doors and windows with tags, dimensions, levels, section marks
A-201Elevations1:50 or 1:100Each face of the building: openings, finishes, level marks
A-301Sections1:50 or 1:100Vertical cuts: foundations, floors, roof, heights, detail callouts
A-501Details1:10 or 1:20How parts are built: wall, roof edge, stair, joinery, waterproofing
A-601SchedulesNTSDoors, windows and finishes as tables: tag, size, type, quantity

Scales: IS 962:1989 recommendations for site plans (1:500 or 1:1000), building plans (1:50 or 1:100) and details (1:10 or 1:20), as summarised by Infralens; elevations and sections typically match the plans. Our sample uses 1:100 for its small site so it stays legible on A3. NTS = not to scale.

Produce Drawing Sets from One Model

Augmintech's BIM Architecture program teaches building information modelling for architecture, where plans, sections, elevations and schedules are generated from a single model and placed on sheets. See the course page for the current syllabus, schedule and fees.

Start Your BIM Career Today

Talk to our BIM training team on WhatsApp — get course structure, duration, fees and placement support in minutes.

Enrol Now →

The sample set, sheet by sheet

Here is a complete seven-sheet set for a small single-storey house, drawn on A3. Click through the sheets in issue order; under each is the checklist of what must appear on it.

PROJECTSAMPLE HOUSE · 2BHK · AUGMINTECHDRAWING TITLECOVER SHEET AND SHEET LISTSCALE (A3)NTSDATE07.11.2026DRAWN / CHECKEDAB / CDSTATUSFOR STUDYSHEET NO.G-001REVDESCRIPTIONDATEP1First issue for study07.11.26All dimensions in mm unless noted. Do not scale. Read with structural and MEP drawings.SAMPLE HOUSE · 2BHKWORKING DRAWING SET · FOR STUDYSingle-storey house, 12.0 x 9.0 m, on an 18 x 15 m plot. Sample set prepared by Augmintech for learning.SHEET LISTSHEET NO.TITLESCALEG-001COVER SHEET AND SHEET LISTNTSA-100SITE PLAN1:100A-101GROUND FLOOR PLAN1:50A-201ELEVATIONS1:50A-301SECTION A-A1:50A-501WALL SECTION DETAIL1:10A-601DOOR AND WINDOW SCHEDULENTSGENERAL NOTES1. All dimensions are in millimetres unless noted (IS 962:1989, cl. 10.2.6).2. Levels are in metres above site datum (GL = +0.000).3. Do not scale from drawings; use written dimensions.4. Read with structural, plumbing, electrical and HVAC drawings.5. Any discrepancy to be reported to the architect before work.6. Sheet numbers follow discipline + sheet type + sequence (A-101).ABBREVIATIONSFFLFinished floor levelGLGround levelDPCDamp-proof courseRCCReinforced cement concreteNTSNot to scaleTOSTop of slabLEGENDWindow (W1, W2, W3) / Ventilator (V1)Door swing (D1 to D4)External wall 230 thickInternal wall 115 thickASection markKEY PLAN (NTS)
PurposeProject name and sheet listMust showGeneral notes (units, datum, "do not scale"), abbreviations, legend, key plan
PROJECTSAMPLE HOUSE · 2BHK · AUGMINTECHDRAWING TITLESITE PLANSCALE (A3)1:100DATE07.11.2026DRAWN / CHECKEDAB / CDSTATUSFOR STUDYSHEET NO.A-100REVDESCRIPTIONDATEP1First issue for study07.11.26All dimensions in mm unless noted. Do not scale. Read with structural and MEP drawings.PROPOSED HOUSEFFL +0.4509.0 m WIDE ROADPARKINGGATE18000 PLOT15000 PLOT12000FRONT SETBACK 3000REAR SETBACK 30001500 SIDE4500 SIDENSITE DATAPlot area270.0 m²Built-up area108.0 m²Ground coverage40%Setbacks3.0 front / 3.0 rear1.5 and 4.5 sides
PurposePlot and building in contextMust showPlot boundary and dimensions, setbacks, footprint, road and access, north point, site data (areas, coverage)
PROJECTSAMPLE HOUSE · 2BHK · AUGMINTECHDRAWING TITLEGROUND FLOOR PLANSCALE (A3)1:50DATE07.11.2026DRAWN / CHECKEDAB / CDSTATUSFOR STUDYSHEET NO.A-101REVDESCRIPTIONDATEP1First issue for study07.11.26All dimensions in mm unless noted. Do not scale. Read with structural and MEP drawings.KITCHEN3.5 x 4.0 mDINING2.0 x 4.0 mLIVING5.5 x 5.0 mBEDROOM 24.0 x 3.5 mTOILET 22.5 x 3.5 mPASSAGE4.0 x 1.5 mUTILITY2.5 x 1.5 mBEDROOM 14.0 x 4.0 mDRESS2.5 x 1.5 mTOILET 12.5 x 2.5 mD1D2D4D2D3D3D4D3D3W4W1W2W2W1V1V1W1W2W3120003500200040002500900040005000NAAFFL +0.450 THROUGHOUT · TOILETS 15 mm BELOW FFLROOM AREAS (centre-line)KITCHEN14.00 m²DINING8.00 m²LIVING27.50 m²BEDROOM 214.00 m²TOILET 28.75 m²PASSAGE6.00 m²UTILITY3.75 m²BEDROOM 116.00 m²DRESS3.75 m²TOILET 16.25 m²
PurposeThe main construction planMust showWalls by thickness, room names and sizes, door and window tags, overall and running dimensions, levels, section marks, north point
PROJECTSAMPLE HOUSE · 2BHK · AUGMINTECHDRAWING TITLEELEVATIONSSCALE (A3)1:50DATE07.11.2026DRAWN / CHECKEDAB / CDSTATUSFOR STUDYSHEET NO.A-201REVDESCRIPTIONDATEP1First issue for study07.11.26All dimensions in mm unless noted. Do not scale. Read with structural and MEP drawings.W4W1D1GL +0.000FFL +0.450TOS +3.600PARAPET +4.500SOUTH (FRONT) ELEVATION 1:50W3V1GL +0.000FFL +0.450TOS +3.600PARAPET +4.500EAST ELEVATION 1:50FINISHESExternal walls: cement plaster,exterior emulsion paintParapet: precast concrete copingPlinth: stone claddingWindows: aluminium, clear glassMain door: teak, PU polish
PurposeEvery face of the buildingMust showOpenings with tags, finishes, ground, floor, roof and parapet levels
PROJECTSAMPLE HOUSE · 2BHK · AUGMINTECHDRAWING TITLESECTION A-ASCALE (A3)1:50DATE07.11.2026DRAWN / CHECKEDAB / CDSTATUSFOR STUDYSHEET NO.A-301REVDESCRIPTIONDATEP1First issue for study07.11.26All dimensions in mm unless noted. Do not scale. Read with structural and MEP drawings.GL +0.000FFL +0.450SOFFIT +3.450TOS +3.600PARAPET +4.500FOUNDATION -1.200BEDROOM 2PASSAGEBEDROOM 13500150040003000 FFL TO SOFFITSECTION A-A 1:501Detail 1, A-501Section cut through Bedroom 2,Passage and Bedroom 1 (see A-101).
PurposeA vertical cut through the buildingMust showFoundations, plinth, walls, slab and parapet, floor-to-ceiling heights, level marks, callouts to details
PROJECTSAMPLE HOUSE · 2BHK · AUGMINTECHDRAWING TITLEWALL SECTION DETAILSCALE (A3)1:10DATE07.11.2026DRAWN / CHECKEDAB / CDSTATUSFOR STUDYSHEET NO.A-501REVDESCRIPTIONDATEP1First issue for study07.11.26All dimensions in mm unless noted. Do not scale. Read with structural and MEP drawings.RCC LINTELWINDOW W1 (see A-601)PRECAST COPING WITH DRIP230 BRICK PARAPET, PLASTEREDUPSTAND OF WATERPROOFING 300150 RCC ROOF SLAB40 SCREED TO FALL 1:100WATERPROOFING MEMBRANE50 PROTECTION SCREED+4.500TOS +3.600+3.450DETAIL 1: PARAPET AND ROOF EDGE 1:10Called up from section A-A (A-301).
PurposeHow one junction is builtMust showEvery layer named, sizes, levels, cross-reference to the section it comes from
PROJECTSAMPLE HOUSE · 2BHK · AUGMINTECHDRAWING TITLEDOOR AND WINDOW SCHEDULESCALE (A3)NTSDATE07.11.2026DRAWN / CHECKEDAB / CDSTATUSFOR STUDYSHEET NO.A-601REVDESCRIPTIONDATEP1First issue for study07.11.26All dimensions in mm unless noted. Do not scale. Read with structural and MEP drawings.DOOR SCHEDULETAGLOCATIONSIZE W x HTYPEMATERIAL / FINISHQTYD1Main entrance1000 x 2100Single, panelledTeak wood, PU polish1D2Bedrooms900 x 2100Single, flushFlush door, laminate2D3Toilets, dress, utility750 x 2100Single, flushWPC, laminate4D4Dining, passage900 x 2100Single, flushFlush door, laminate2WINDOW SCHEDULETAGLOCATIONSIZE W x HSILL (FFL)TYPE / GLAZINGQTYW1Living (side), bedrooms1800 x 1350900Aluminium sliding, 5 mm clear3W4Living (front)2400 x 1350900Aluminium sliding, 5 mm clear1W2Kitchen, dining1200 x 1350900Aluminium sliding3W3Utility900 x 1350900Aluminium sliding1V1Toilets600 x 6002100Aluminium louvre, frosted2Sizes are clear openings in mm. Quantities to be checked against plan A-101 before ordering.ELEVATION KEYD1D2W1V1
PurposeOpenings as dataMust showTag, location, size, type, material and quantity for every door and window, matching the plan tags

Architectural vs Construction Drawings

Architectural drawings are one part of the construction set. The full set adds the engineers' drawings, each in its own numbered series, and the contractor builds from all of them read together.

SetPrefixPrepared byMain content
ArchitecturalAArchitectPlans, elevations, sections, details, door, window and finish schedules
StructuralSStructural engineerFoundations, column and beam layouts, slab reinforcement, bar bending schedules
Mechanical (HVAC)MMEP engineerDuct and pipe layouts, equipment schedules
PlumbingPMEP engineerWater supply, drainage, sanitary fixtures
ElectricalEMEP engineerLighting, power, single-line diagrams
Fire protectionFFire engineerSprinklers, hydrants, fire alarm
Construction setAllWhole team, coordinatedEvery series above, cross-referenced and issued together for construction

Prefix letters follow the US National CAD Standard as explained by Archtoolbox. IS 962:1989 also requires drawing numbers in each series (architectural, structural, plumbing, electrical, mechanical) to carry a letter prefix.

In practice, the construction set is issued in stages, often called Issued for Construction (IFC), Good for Construction (GFC) or Approved for Construction (AFC), depending on the office. Each issue carries a revision letter or number in the title block so the site always works from the latest sheet.

Sheet Numbering and Drawing Standards

A sheet number tells you what is on the sheet before you open it. The most widely used format, from the US National CAD Standard (NCS), has three parts:

A
Discipline: A architectural, S structural, M mechanical
-
1
Sheet type: 1 means plans
01
Sequence: first sheet of that type, 01 to 99
0General
1Plans
2Elevations
3Sections
4Large-scale views
5Details
6Schedules, diagrams
7–8User-defined
93D views

Sequence numbers do not have to be consecutive, so you can leave gaps for sheets added later. Many Indian and Gulf offices use their own variation, such as A-01, A-02, but the logic of discipline plus number is the same.

In India, the reference standard for architectural drawings is IS 962:1989, Code of Practice for Architectural and Building Drawings (second revision). Its key rules:

Sheets and title block

  • A-series sheets, A0 to A4, using the smallest size that keeps the drawing clear
  • Title block at bottom right, visible when the print is folded
  • A revision panel recording number, description, date and approval

Dimensions and scales

  • Dimensions normally in millimetres (cl. 10.2.6)
  • Unit can be omitted if a note states it for the whole drawing
  • Scales chosen per IS 10713, from the recommended list

Lines and lettering

  • Two line thicknesses, thick at least twice the thin
  • Thick for outlines, thin for dimensions and hatching
  • Prints folded to A4 with the title block on top

How Revit Produces a Drawing Set from One Model

In AutoCAD, each plan, section and elevation is a separate drawing that you keep in step by hand. In Revit, they are all views of one 3D model. Move a wall and every plan, section, elevation and schedule that shows it updates.

ModelWalls, floors, doors, windows
›
ViewsPlans, sections, elevations, details
›
SheetsTitle block plus placed views
›
SchedulesDoors, windows, sheet list
  1. Create sheets. Go to View › Sheet Composition › Sheet, pick a title block, then fill in the sheet number and name.
  2. Place views. Drag plans, sections and elevations from the Project Browser onto the sheet. A view can sit on only one sheet; duplicate it to show it on another.
  3. Add schedules. Door and window schedules read their tags, sizes and counts straight from the model.
  4. Build the sheet list. View › Schedules › Sheet List creates a schedule of sheets that Autodesk describes as a table of contents for the set.
  5. Issue revisions. Record each issue in the project's revisions, and the revision schedule in each affected sheet's title block lists it.
Illustrative workflow showing drawing views and a floor plan on an A3 sheet
Illustrative model-to-sheet workflow: selected views are placed within a title block. This is an explanatory diagram, not a Revit screenshot.
Seven-sheet architectural drawing index with sheet numbers, names and revisions
A readable index of the seven sample sheets, with sheet numbers, names and revisions. Illustrative sheet list, not a software screenshot.

Submission Drawings for the Gulf

Gulf authorities set their own drawing submission formats and portals, and these change, so always download the current checklist for your project. In Dubai, applications for a new building permit go through the Dubai Building Permits System (BPS), and a July 2024 guide lists these drawing packages:

Architectural drawings
Structural drawings
Electromechanical (MEP) drawings
Thermal insulation and drainage plans
Road layouts
Civil Defense plans

The application is reviewed by several government authorities through the BPS, and Dubai Municipality then issues the permit and stamps the drawings.

BIM models too: since 1 January 2024, Dubai requires BIM model submissions for building permits on larger projects, including buildings over 20 floors or 20,000 m² for architectural designs, specialised buildings such as hospitals and universities, and government projects, with models submitted in IFC format (as summarised on Autodesk's Dubai BIM mandate page). Check the Dubai Municipality circular for the current thresholds.
Architectural drawing set and scale rule on a site office table
A printed architectural drawing set on a site table. AI-generated editorial illustration; use the sample sheets above for readable drawing details.

Frequently Asked Questions

What is a working drawing in architecture?
A working drawing is a dimensioned, annotated drawing with enough information to build from. The full working drawing set includes the site plan, floor plans, elevations, sections, details and schedules.
What drawings are included in a working drawing set?
In issue order: a cover sheet with the sheet list and general notes, the site plan, floor plans, elevations, sections, details, and door, window and finish schedules. The full construction set adds structural and MEP drawings.
What is the difference between working drawings and construction drawings?
Working drawings usually means the architect's buildable drawings. Construction drawings is the wider set issued for building, which combines the architectural, structural, mechanical, plumbing, electrical and fire drawings into one coordinated package.
What scale are working drawings drawn at?
Under IS 962:1989, site plans are typically 1:500 or 1:1000, building plans 1:50 or 1:100, and details 1:10 or 1:20. Elevations and sections usually match the plan scale. Dimensions are written in millimetres.
Can Revit create working drawings?
Yes. Revit generates plans, sections, elevations and schedules as views of one model, places them on sheets with title blocks, and keeps them all updated when the design changes. It can also produce a sheet list for the whole set.

Sources

This article was last reviewed on 7 November 2026.

Enlarged drawing

Ready to start your engineering career journey?

Investing in structured training is one of the best ways to set yourself apart in MEP engineering. Our Courses cover HVAC, electrical and plumbing design in depth, plus tools like HAP software — the exact skillset that sets you apart in a competitive field.

Augmintech-logo-white

This Exclusive PG Program will Skyrocket your Career!

*Limited Seats Available